Project Scheduling with Time Windows and Scarce Resources: Temporal and Resource-Constrained Project Scheduling with Regular and Nonregular Objective Functions
Project Scheduling with Time Windows and Scarce Resources: Temporal and Resource-Constrained Project Scheduling with Regular and Nonregular Objective Functions
A survey of the state of the art of deterministic resource-constrained project scheduling with time windows. General temporal constraints and several different types of limited resources are considered. A large variety of time-based, financial, and resource-based objectives - important in practice - are studied. A thorough structural analysis of the feasible region of project scheduling problems and a classification and detailed investigation of objective functions are performed, which can be exploited for developing ...
Read More
A survey of the state of the art of deterministic resource-constrained project scheduling with time windows. General temporal constraints and several different types of limited resources are considered. A large variety of time-based, financial, and resource-based objectives - important in practice - are studied. A thorough structural analysis of the feasible region of project scheduling problems and a classification and detailed investigation of objective functions are performed, which can be exploited for developing efficient exact and heuristic solution methods. New interesting applications of project scheduling to production and operations management as well as investment projects are discussed in the second edition.
Read Less
Add this copy of Project Scheduling With Time Windows and Scarce Re to cart. $121.04, new condition, Sold by Educational Media Centre rated 4.0 out of 5 stars, ships from New Delhi, DELHI, INDIA, published 2012 by Springer-Verlag Berlin and Heidelberg GmbH & Co. K.
Edition:
2012, Springer-Verlag Berlin and Heidelberg GmbH & Co. K
Add this copy of Project Scheduling With Time Windows and Scarce Re to cart. $121.18, new condition, Sold by Educational Media Centre rated 4.0 out of 5 stars, ships from New Delhi, DELHI, INDIA, published 2003 by Springer.
Add this copy of Project Scheduling With Time Windows and Scarce Re to cart. $136.15, new condition, Sold by Basi6 International rated 5.0 out of 5 stars, ships from Irving, TX, UNITED STATES, published 2012 by Springer-Verlag Berlin and Heidelberg GmbH & Co. K.
Edition:
2012, Springer-Verlag Berlin and Heidelberg GmbH & Co. K
Add this copy of Project Scheduling With Time Windows and Scarce Re to cart. $136.15, new condition, Sold by Basi6 International rated 5.0 out of 5 stars, ships from Irving, TX, UNITED STATES, published 2003 by Springer.
All Editions of Project Scheduling with Time Windows and Scarce Resources: Temporal and Resource-Constrained Project Scheduling with Regular and Nonregular Objective Functions